Leave Your Message
Garden Water Plastic Rear Water Hose Nozzles Outdoor Industrial Spray Hose Nozzles
Products

Garden Water Plastic Rear Water Hose Nozzles Outdoor Industrial Spray Hose Nozzles

Soft Grip
Variable Flow Controls
Variable Spray Patterns

    Parameters

    Product name

    Heavy Duty High Pressure Washer

    Model No.

    XF37101

    Main Material

    ABS

    MOQ

    2000pcs

    Original place

    Zhejiang, China

    Application

    Hotels, Building Material Shops, Manufacturing Plant, Machinery Repair Shops, Restaurant, Home Use, Retail, Printing Shops, Construction works , Energy & Mining, Other

    Features

    High pressure garden sprinkler, Variable Flow Controls, Variable Spray Patterns, Soft Grip

    Color

    As picture shows or according to your need

    Carton packaging size

    58*42*42CM

    Port

    Ningbo/Shanghai

    Product Description

    ● WATER HOSE NOZZLE - spray nozzle has 1 adjustable hose sprayer patterns and lets you to use high pressure hose nozzle for watering your patio lawn, gardening and washing your cars and pets
    ● NOZZLE SPRAYER - This hose nozzle heavy duty is made of metal and ABS Plastic with  rubber coating making it very durable.
    ● ERGONOMIC HANDLE - Our nozzle is with ergonomic handle design to fit your palm curve perfectly, non-slipping and enhance grip, effectively relieve hand stress and fatigue.
    ● HOSE SPRAYER NOZZLE - Ergonomic shape slip-resistant rubber coating design ensure the best experience while using our hose nozzles. Your hand will never tired after watering your garden.
    49 (4)49 (1)

    FAQ

    Q1: Can I get some samples for testing?
    A: Yes, please provide your shipping address and we will require the shipping cost in advance via Paypal.
    Q2: When can I get the samples after I make the shipping costs?
    A: Normally we need 5-7 days to organize and prepare the samples.
    Q3: Can I customize the products colors and packaging?
    A: Yes, we will have the MOQ request and we can then customize the products colors and your personalized packaging.
    Q4:What is the lead time?
    A: It depends on if it is our off or peak season. 
    Between March to Sepetember, the lead time is around 20-25 days.
    Other than these periods, the lead time needs to be 30-35 days.