| Application Compatibility |
Fluid, operating pressure, temperature, and media concentration |
Hose tube, reinforcement, cover, and splitter material must be compatible with the specified fluid and the complete operating temperature range. |
Completed technical datasheet, chemical compatibility chart, application questionnaire, and engineering approval. |
Critical |
20% |
| Pressure Performance |
Working pressure and burst pressure |
Rated working pressure must meet or exceed the system requirement. For hydraulic assemblies, a commonly used benchmark is a 4:1 minimum burst-to-working-pressure ratio, subject to the applicable standard and hose type. |
Pressure-rating documentation, burst-test records, proof-test procedure, and traceable batch results. |
Critical |
15% |
| Dimensional Accuracy |
Inside diameter, outside diameter, length, port size, and branch spacing |
Dimensions must conform to the approved drawing and specified tolerances. Connection geometry must allow installation without excessive bending or torsion. |
Controlled drawing, inspection report, calibrated measuring equipment, and first-article inspection record. |
Critical |
12% |
| Material and Construction |
Tube, reinforcement, cover, fittings, clamps, and splitter body |
Materials must be declared by grade or specification. Reinforcement type and fitting attachment method must match the pressure, temperature, and flexing requirements. |
Material declarations, certificates of conformity, incoming inspection records, and construction drawings. |
Critical |
10% |
| Certifications and Compliance |
Quality, environmental, chemical, and market-access requirements |
Supplier quality management should be certified to ISO 9001 or an equivalent system. ISO 14001 may support environmental sourcing objectives. REACH and RoHS declarations should be supplied when applicable to the destination market and product materials. |
Current certificates, certification scope, declaration of conformity, restricted-substance statement, and audit history. |
Critical |
10% |
| Product Testing |
Leakage, proof pressure, burst, impulse, flexing, and temperature testing |
Testing must reflect the intended service conditions. Every production lot should receive documented dimensional and leakage checks; qualification tests should be performed according to the applicable hose or assembly standard. |
Test plan, laboratory capability statement, sample reports, calibration certificates, and nonconformance records. |
Critical |
12% |
| Production Capacity |
Monthly capacity, equipment, lead time, and utilization |
Verified capacity should cover forecast demand plus a practical safety margin. The supplier should demonstrate stable output, documented bottleneck controls, and a quoted lead time supported by production data. |
Capacity calculation, equipment list, production schedule, historical on-time delivery rate, and capacity-expansion plan. |
Important |
8% |
| Traceability and Quality Control |
Lot identification, raw-material records, inspection points, and corrective action |
Each finished assembly should be traceable to its production date, raw-material batch, operator or workstation, inspection results, and shipment record. |
Lot-code system, inspection plan, control charts where applicable, retained samples, and corrective-action reports. |
Critical |
8% |
| Packaging and Global Logistics |
Protection, labeling, export documentation, and storage conditions |
Packaging must prevent crushing, contamination, moisture damage, and deformation. Labels should include part number, quantity, lot code, production date, and handling instructions where required. |
Packaging specification, carton drop or protection test, packing list, commercial invoice, and country-of-origin documentation. |
Standard |
3% |
| Commercial and Supply Risk |
Total landed cost, minimum order quantity, payment terms, and continuity plan |
Compare unit price together with tooling, testing, freight, duties, packaging, warranty exposure, and inventory requirements. Supplier should maintain a documented business-continuity and alternate-material plan. |
Detailed quotation, cost breakdown, tooling ownership terms, warranty policy, contingency plan, and financial or operational risk review. |
Important |
2% |